Tub-to-Shower Conversion in Seattle: Cost, Code and Trade-offs

ryanwatt425 • October 28, 2026

Share this article

Tub-to-Shower Conversion in Seattle: Cost, Code and Trade-offs

Short answer


A tub-to-shower conversion in Seattle typically runs $8,000 to $15,000 with a prefabricated shower base and surround, and $15,000 to $25,000 or more with a custom tiled shower. The technical work is the drain: a tub drain is 1.5 inches and a shower drain is 2 inches, so the line usually has to be changed.


---


What the job actually involves


It sounds like swapping one box for another. It isn't.


**The drain changes size.** Plumbing code generally requires a 2-inch drain for a shower, where a tub is 1.5 inches. That means opening the floor or the ceiling below to change the trap and the branch line — and in a house on a crawlspace that's simple, while over a finished room it means opening and repairing that ceiling.


**The drain often changes position.** A tub drain sits at one end. A shower drain sits at the center of the pan, or along one wall for a linear drain. Moving it means new line at correct slope.


**The framing usually needs work.** A tub is 30 or 32 inches deep; a shower is usually the same footprint but sometimes wider once the tub's apron is gone. The walls need backer board and blocking for a bench, a niche, a grab bar or a glass panel.


**Waterproofing gets much more important.** A tub is a watertight vessel that catches everything. A tiled shower is a wall and floor assembly that is only as good as the membrane behind it. This is where a cheap conversion fails, usually in year two or three, usually into the ceiling below.


Cost by approach

Approach Typical Seattle range Time on site Notes
Prefabricated base + acrylic or solid-surface surround $8,000–$15,000 1–2 weeks Fast, watertight from the factory, limited sizes
Prefabricated base + tiled walls $12,000–$20,000 2–3 weeks Compromise; the pan is the hardest part to tile well anyway
Fully tiled shower, curbed $15,000–$25,000 3–4 weeks Full design freedom; membrane and slope done on site
Fully tiled, curbless $20,000–$35,000+ 4–5 weeks Requires recessing the pan into the floor structure

Add for: moving the drain more than a couple of feet, opening a finished ceiling below, a frameless glass enclosure (typically $1,500–$4,000 and fabricated after tile), heated floor, or asbestos abatement in an older home.


Should you do it? The resale question, honestly


The common advice is "always keep one tub in the house." That's roughly right, with nuance.


**Keep a tub if:** you have small children, you plan to sell to families, or this is the only full bathroom in the house. A house with no tub at all narrows the buyer pool, particularly for family buyers.


**Convert if:** you have another tub elsewhere, nobody in the household uses this one, or accessibility is the reason. Aging-in-place is a strong argument — stepping over a 16-inch tub wall is a fall risk, and a curbless or low-curb shower removes it.


In a lot of Seattle homes the practical answer is: convert the primary or upstairs bath to a shower, keep the tub in the hall bath.


The accessibility case, done properly


If accessibility is the reason, a few details matter more than the shower itself:


- **Curbless or low curb.** Zero threshold is best; a 2-inch curb is a large improvement over a 16-inch tub wall.

- **A 36-inch-wide entry minimum,** wider if a walker or wheelchair is in the picture.

- **Blocking in the walls for grab bars** — put it in even if the bars go in later. Blocking during framing costs almost nothing; adding it afterward means opening finished tile.

- **A bench,** built in, not a plastic stool.

- **A handheld shower on a slide bar** in addition to the fixed head.

- **A slip-resistant floor tile.** Small-format tile with more grout lines gives more traction than a large polished tile. Look for a tile with a published dynamic coefficient of friction rating suitable for wet areas.


Permits and code in Seattle


Replacing a tub with a shower involves plumbing changes, so it requires a permit from Seattle's Department of Construction and Inspections. Most bathroom work of this kind qualifies for a subject-to-field-inspection permit rather than full plan review — SDCI screens those applications in a few days, and permits stay valid for 18 months.


There will be a rough plumbing inspection before anything is covered. A conversion done without a permit becomes an unpermitted-work disclosure when you sell.


What goes wrong in a cheap conversion


Three failure modes, all of them expensive:


1. **The pan isn't sloped correctly.** Water stands. Grout stays wet. Eventually it finds a way through.

2. **The membrane isn't continuous.** Corners, the curb, and the drain flange are where it fails. A proper job flood-tests the pan before tile.

3. **The wall board is wrong.** Standard drywall or non-waterproof board behind tile in a wet area will fail. Cement board or a bonded waterproof board system, with the membrane detail carried into the corners.


Ask any bidder: what membrane are you using, and do you flood-test the pan? The answers separate the bids.


How Fortress Build & Finish does a conversion


Tile is a named craft here, not a subcontracted line. We slope the pan on site, carry the membrane into every corner and up the curb, flood-test before a tile goes down, and flatten the substrate so the finished plane is dead flat rather than approximately flat.


We also block for grab bars whether or not you want them today. It costs nothing now and it's the difference between a future modification being a Saturday and being a demolition.


Frequently asked questions


How much does it cost to convert a tub to a shower?

$8,000–$15,000 with a prefabricated base and surround, $15,000–$25,000 or more for a fully tiled shower in the Seattle market.


Do I need a permit to replace a bathtub with a shower?

Yes. It involves plumbing changes, which require a permit from SDCI and a rough plumbing inspection.


Does removing the only bathtub hurt resale value?

It can, particularly with buyers who have young children. If the house has another tub, converting one bathroom is generally low risk.


How long does a tub-to-shower conversion take?

One to two weeks for a prefabricated unit, three to four weeks for a custom tiled shower including waterproofing, flood test and grout cure.


Can I convert a tub to a curbless shower?

Sometimes. It requires recessing the pan into the floor structure, which is realistic over an accessible crawlspace or joist bay and much harder over a finished room or a slab.


---


**About the author.** Ryan Watt is the marketing director at Fortress Build & Finish, a Seattle-owned finish contractor with more than 25 years in residential and commercial remodeling, custom carpentry, tile installation, and fire and water damage restoration.


*Fortress Build & Finish — (206) 426-2067 · Licensed, bonded and insured — License No. FORTRBF756KA · Serving Seattle, Ballard, Magnolia, Queen Anne, West Seattle, Capitol Hill, Wallingford, Bellevue, Kirkland, Renton, Shoreline, Edmonds and the surrounding communities · fortressbuildfinish.com*

Recent Posts

By ryanwatt425 • October 27, 2026
Wallingford and Green Lake are dense with 1905–1930 Craftsman homes on standard lots with full basements. Here's what that means for remodels, DADUs and budgets.
By ryanwatt425 • October 26, 2026
Bellevue kitchen remodel costs, broken down by scope — and the three things about Eastside housing stock that move the number up or down against a Seattle project.
By ryanwatt425 • October 24, 2026
Remodeling while staying open? Learn strategies Seattle businesses use to minimize disruption during construction. Fortress Build & Finish.
By ryanwatt425 • October 22, 2026
How a Kirkland whole-home remodel is sequenced, what drives the schedule, whether to live in it, and the decisions that have to be made before demolition starts.
By ryanwatt425 • October 9, 2026
Fixed-price caps your exposure but prices in risk. Cost-plus shows the real numbers but caps nothing. Here's when each is right and how to protect yourself in either.
By ryanwatt425 • October 7, 2026
An island needs about 12 feet of room width; a peninsula works below that. Here's how to choose between them, what each costs, and when a peninsula is the better call.
By ryanwatt425 • October 6, 2026
Design-build, a general contractor with a designer, or an architect-led project — how each is structured, what each costs, and which fits your project.
By ryanwatt425 • October 5, 2026
Insurers recommend preferred vendors, but homeowners generally choose their own contractor. Here's how preferred programs work and what you're trading either way.
By ryanwatt425 • October 4, 2026
Shoreline and Edmonds are separate jurisdictions with mostly 1950s–1970s housing. Here's what mid-century ramblers need, and how light rail changed the north end.
By ryanwatt425 • October 3, 2026
How Shoreline's permit process works for a residential remodel — Permit Services, the online portal, the light rail station subarea changes, and where the permit line falls.
Show More